Posted by a. Rahman Isnaini r. Sutan on May 13, 2008
It’s 3 years we have been through along the way towarding a better provider.
And H.A who firstly pioneered this “migration” to that “Telco Blue Building”- called as TBB located in Mega Kuningan in 2006.
Second, who else
it’s me who takes only 7 days working and shocking all over this TBB for a fastest turn over 
Third, R.S.Putra who migrated to a Telco & IT/IP Vendor Product before to this TBB for staying 4 months while in the end has to take a good challenge on another quite new mobile communication operator.
Lately Iwan Wibisana to TBB this week.
Find out the Video here : http://indotube6.indo.net.id/

Sometimes an engineer needs another challenge againts his/her skill.
Proof their existance, to survive.
The decision truely is not an easy one, but completely full of justifications and risks.
I’ve been there before.
Like navigating a ship (life), always takes time for each moving / direction.
Good Luck Iwi.

Make a lot friends there.
Keep us in touched.
a. rahman isnaini r.sutan
Posted in IndoInternet, netsoft, technologies | 1 Comment »
Posted by a. Rahman Isnaini r. Sutan on May 13, 2008
As the telecommunication especially mobile operator rate is now became cheaper & cheaper (compared to SLJJ). The quality [should] still needed to be maintained.
From What I have been through as one of GSM user lately, it’s been many times facing “network busy” even in a critical communication needed immediately to be established with Office, Partner & ect.
I believe this Busy Network was not only happened in GSM XL Mobile Network.
Since all operator is now doing the same thing in pricing.
Lower rate & Extreme Promotion has caused what I might assumed as Congestion Traffic either Voice or even Data that always drop due to it’s default priority in a BTS Channels.
Busy Network could occur when idle channel is not available in a Base Transceiver Station (BTS) to take care of voice or data request.
The BTS channel comprises of :

Therefor once another request get in to the receiving system of a BTS, it will be rejected and informed that Network is now Busy to take care of this request to MS (Mobile Station or Handset).
I’m not pretty sure, this kind of Network Information Status sent by BSC or BTS system it self using SDCCH.
Wishing All Operator not just thinking how to compete in the matter of price but concerning as well on maintaining Capacity & Quality of BTS, BSC, MSC Backbone.
a. rahman isnaini r.sutan
Posted in Mobile | No Comments »